What technical evidence should we request from a supplier?+
Start with the component’s critical requirements, then agree material traceability, manufacturing and post-processing records, dimensional inspection and any relevant test results. The depth of evidence should reflect the application and consequences of failure, rather than a generic document checklist.
When does a manufacturing change need renewed qualification?+
A change in material, equipment, parameters, orientation, heat treatment, finishing or supplier may affect the qualified result. Define the review and requalification triggers in the agreed control plan. Not every change needs the same response, but the decision and supporting rationale should be documented.
Does supplier certification qualify every part?+
No. A supplier’s quality system, a qualified production process and an application-specific part release are different scopes. The evidence needed depends on the intended application and customer requirements.
Does Additive Center issue the certification?+
No. We support maturity and preparation. Independent auditing and certification are performed by the relevant certification body.
Which standard applies?+
Our preparation approach references ASTM AMQ and ISO/ASTM 52920. The applicable requirements, scope and program arrangements are established for the specific engagement.
Is successful certification guaranteed?+
Readiness support does not replace an independent audit or guarantee its outcome. The agreed scope and responsibilities are established before work starts.